Cycle facility engineering
Objectives and a summary of the topics discussed at meetings with Dave Stewart.
CCC meets with Dave Stewart the officer at Camden council responsible for cycle schemes. These meetings take place about four times a year.
The objective of these meetings is to allow CCC to provide input into cycling schemes from pre-consultation stage, through development and during their usage.
The main discussions have involved the LCN+ routes 0 (the SSL) and 6 (the north-south route) as well as the recent CRISPs on the new Link 27 and on the north south route.
These routes were planned long before either the LCN+ or the CRISP process was introduced. In fact, the SSL was initially concevied by Paul Gannon.
Last modified 18-Aug-2006 04:55