Hampstead Heath campaign
City of London received responses to Stage 1 of the consultation in Spring 2007 (see below). Intelligent Space presented results of Cycling Review on 12 December 2007. CCC replied 28 Jan 2008. March 2008 management committee decided that Links 1 and 7 should be studied in more detail. June 23 2008, MC received design and speed reports from Simon Lee. Decision deferred until September 2008. Decision delayed further by bid for Lottery Funding for Master Plan. April 2009 Lottery bid failed. Endless delay on Link 1 due to City's refusal to reinstate original plan until they decide where vehicles should enter Heath and then things about a Master Plan. March 2011 Link 7 agreed, but waiting for CoL to install chicane
Summary of our campaign:
- have a look at: CCC Campaign summary written in 2007.
- have a look at the existing cycleways and the links we proposed in 2007 at Proposals for new links (Google Maps).
- have a look at the previous campaign.
Progress
- Camden Council obtained Greenway funding, consulted on and implemented a shared-use path adjacent to the Heath along the footway between Jack Straw's Castle and Spaniards End during 2008. The result is spoilt by it's not being quite end to end. Description of the Spaniards Path).
- Camden Council implemented a wheel channel on Savernake Bridge, July 2009
- Pedestrian and Cycling working group started meeting July 2009 and continued until early 2011 with very little gain for cycling.
Pedestrian and Cycle Observation Study
The City of London commissioned consultants Intelligent Space ATKINS to conduct a series of user surveys on Hampstead Heath during the summer and autumn of 2007 in order to determine user patterns, particularly of pedestrians and cycles, user demographics and public opinion. They looked at the suitability of existing routes and some suggested routes for pedestrians and cycles to share. The aims of the Study reflect commitments made in the draft Part I Hampstead Heath Management Plan. An Executive Summary of this Pedestrian and Cycle Observation Study was produced in December 2007.
Download executive Summary from Hampstead Heath page on City of London website
Download full Pedestrian and Cycle Study (45 Mbyte PDF)
Three CCC committee members (Stefano, John and Jean) attended a Seminar on the report on 12 December 2007. We were very disappointed by the findings. Brief Summary of the Seminar
Intelligent Space recommend:
- Link 1 and Savernake Bridge links are suitable for consideration for shared use
- Links 2, 3 and 6 are good enough on their own merits, but are not recommended because heavy max pedestrian flows on (2), the likihood of riding from (3) to an non-designated path and the additional load on cycleway C if (6) is becomes a shared use path.
- Links 4 and 5 are not up to standard.
The details are in the Exec Summary. We have the full report on a disc.
See CCC's response Pedestrian and Cycle Observation Study sent to City of London by 1st February 2008.
In December 2007, we were told that a final decision on cycle links will be reached in July 2008 The timetable for reaching a decision
March 31st 2008, Hampstead Heath Management Committee decided that detailed designs for Links 1 and 7 should be implemented for further consideration in May.
May 2008 Simon Lee organised walk (with reps from CCC. Heath for Feet and the Consultative Committee) to help WS Atkins to review Routes 1 and 7 in more detail and reviewing certain aspects of Routes B and C. Atkins Minutes on Site Visit
June 23rd 2008. Hampstead Heath Management Committee received report from Superintendant on detailed designs and costs for Links 1 and 7, speed surveys and equlity impact. Further reports requested for meeting 28th July. Final decision on 22nd September. The speed surveys are worrying - many cyclist cycle above 12 mph, which we now discover is the speed limit (not 8 mph as show on signs). See Simon Lee's Report.
14th July 2008 Simon Lee speaks to Jean Dollimore on the phone. He says that decisions on the Links 1 and 7 must be deferred until at least October. See Minutes of CCC meeting July 2008 JD had tried to encourage some speedup of this process in order to take advantage of Greenway funding.
August 2008 City of London Consultation on Parliament Hill Triangle shows a scheme for Link 1. (Vehicles and cyclists to use separate route parallel to Lido path). See details of consultation. City London hope to obtain Lottery Funding to carry out their Master Plan. They will defer decisions until November 2008.
January 2009 CCC asked Simon Lee to tell us the outcome of the consultation and of the date when a decision will be made on the implementation of Links 1 and 7. Notes on response by phone and following emails. In short, no news yet about lottery funding, small news on Links B, C (Improvements), 1 and 7 still under considertaion; plans for ped-cyce working group group.
May 2009 CCC writes to Bob Hall (retiring chair of Management Cttee), saying we've heard that the Lottery Bid failed and asking him to reinstate the original idea for Link 1. Letter to Bob Hall
June 2009 Simon Lee sends email response to letter to Bob Hall: can't decide on Link 1 until masterplan for Parliament Hill triangle decided. Text of email from Simon Lee
Sustrans Greenways Consultation CCC suggested Greenway links throughout Camden including Links 1 and 7 and a request that Sustrans work with English Heritage on Link 5. Sustrans will be managing the Greenway funding for TfL from now on. CCC suggestions for Greenway Links
July 2009 Savernake Bridge (news of wheel channel)Read news of opening.
Summer 2010. Second wheel channel implemented.
Pedestrian and Cycle Working Group
First meeting of Working Group. (attended by SC and JD). Terms ref, Greenway funding for improvements to B and C; Link 1 still stalled by Master Plan, now wheel channel in place, City want a staggered barrier for Link 7 . Minutes of meeting
September 2009 Meeting of Working Group (attended by JD)).Site visit to Routes B and C. Update on Links 1 and 7. Deisgn of barriers for Link 7 agreed; Link 1 still waiting for external consultants' safety studies related to Master Plan (i.e. effect of mixing vehicle, peds and cyclists on Link A (Broadwalk)..... . The results of this study would provide the City with empirical data on which to formulate a rationale with to proceed with the MasterplanMinutes of meeting
December 2009 Meeting of Working Group (attended by JD) to discuss the Sustrans Draft Report. It seems that there is great consternation amongst the antis that Sustrans mentioned the idea that Link 5 would be an aspiration. Simon Lee had persuaded Sustrans to omit that paragraph. It was also noted that the section on the Heath mentioned the City's aspirations for cycle routes round the Heath and along railway land to Kentish Town. Simon Lee said once more that we still must wait for news on link 1.
January 2010 Meeting of Working Group (JD attended). Route B plans for improvement discussed - move away from hedge to improve views. Link 1- City still waiting for safety report on idea of having vehicle entry via Highgate Road. Link 7 waiting for signs at top of ramp, but will install barrier. Minutes of Meeting
September 2010 Meeting of Working Group (No rep from CCC). Route B has been surface but JD, SL and JW to meet to discuss chicanes. Route C and D improvements out to tender. Link 1-changes at Highgate Road SL to look at Link 1 as part of Master Plan. Link 7 CoL want permission from camden for barrier and camden to install signs. Proposals for Shared Use provision – North End Way. Minutes of Meeting
November 2010 Meeting of Working Group (SC attended). Route B: JD, SL and JW to met to discuss chicanes. SC protested at use of funds to reinstate existing path, but no new one. Link 1-need to wait for revision of Master Plan. Link 7 CoL waiting for permission from camden for barrier and camden waiting for permission from DfT to install signs. Minutes of Meeting
March 2011 Meeting of Working Group (No rep from CCC). Link 7 to go ahead as soon as CoL has installed chicane. No more greenways funding. North End Way - will need to be funded by Camden. Enforcement - reckless cyclists fined heavily in court. Signage and shared use. One more meeting, then terminate group. Minutes of Meeting
October 2011. Meeting of Working Group (JD attended). Link 7 still not complete but promised imminently. Link 1: strong support from Ian Harrison and Bob Slowe but Simon Lee said all he can think about at the moment is the dam. Agreed to dissolve the group but JD promised to continue to pursue the matter of Link 1. Minutes of Meeting
CCC's response to Stage 1 of consultation
City of London consulted on their new management plan in Summer 2007. See Towards a Plan for the Heath. CCC replied: CCC Response to Heath Management Plan (4.4 Mbyte PDF).
Some Reports prepared by CCC for the above response
- A study of school catchment areas and routes to school. The potential of the Heath for Safer Routes to schools
- A study of times to cycle to the Heath, compared with using bus/train Journey times. Cycling almost always came out best.
- Cycle counts, October 2006. Cycle Counts
Other related material from 2007
Advice on how individuals should reply to consultation Issued may 2007
Families ride on the Heath advertised in local papers. Event Flyer Took place July 2007