TfL/Buchanan CRISP Kings Cross to Elephant cycle route
Background
CCC has been contacted as stakeholders, concerning a new cycle route that TfL is planning to provide. This is the route from Kings Cross to Elephant and Castle.
We have been invited to provide input to the study on this route. First we have to reply to the four questions shown below the plan.
The route being considered is shown on the plan below. It includes the following roads:
Kings Cross Road, Farringdon Road, Farringdon Street, Blackfriars Road and London Road (part).
A201 Cycle Route Questionnaire for Stakeholders
Implementation of the recommendations
Holborn Viaduct
Drawing on paper circulated
Kings Cross Road/Penton Rise
This scheme was consulted early in 2007. See details
Redesign of junction at Lloyd Baker/Margery Street/Calthorpe Street
CRISP Report item. CAMISL04, 1-3. The recommendations just specify " major junction remodelling, remove guard railings ". Saying that CCC emphasised the difficulty with the width of the junction and of turning right into the junction.
The following drawing was supplied by Owen Bentley to Ralph Smyth by email in April 2007.
Proposals for Improvements on Farringdon Road
See the consultation and joint reply with ICAG and City Cyclists at:
Proposed Design for Ray Street contraflow- Feb 2008
Download Ray Street design drawing
Proposals for Improvements on Rosebery Avenue for Bus Route 38
January 2008: we have received a drawing showing a proposed design for the junction of Rosebery Avenue and Farringdon Road (west side)
This is part of work to impprove the effectiveness of Route 38 but appears to be very detrimental to cyclists.