Bloomsbury Vision 2008
Following Terry Farrel's schematic proposals, urban design specialists Burns and Nice have been commissioned to develop proposals for improvements to "the physical environment" of Bloomsbury in the following "key locations"
- Byng Place
- Malet Street
- Montague Place
- Great Russell Street
This page contains links to reports on meetings with the consultants and summaries of CCC members reactions to the proposals.
Bloomsbury Vision : workshop 1
Two meetings were held in the first week of April. The first a stakeholder workshop. Report on Workshop by SC and JD.
Bloomsbury Vision : Cycling
The second meeting was about cycling in the context of the Bloomsbury Vision - called by Sam Monck. Report on Meeting with Sam Monck by SC and JD.
CCC Notes on the implications of these meetings (mainly for SSL)
Following the above two meetings, the CCC Committee agreed on some of the Implications for SSL
CCC Members reactions to the Bloomsbury Vision
We reported the above meetings to members on the mailing list and at a meeting on 14th April. JD asked for advice as to a position to adopt at the forthcoming Steering Group Meeting. CCC's position on SSL/Byng Place April 2008
Bloomsbury Vision Steering Group
The first meeting was held at the Town Hall on 18 April 2008
Notes by JD and Paul Braithwaite.
The second meeting was held at the Town Hall on 11 June 2008